Insights · Aug 15, 2026

03 Dương Đình Nghệ, Yên Hòa, Hanoi
Service charges and VAT are not included in the displayed reference rent.
Vinacomin Tower is a large-scale office building at 03 Duong Dinh Nghe Street, Yen Hoa Ward, Hanoi, developed and managed by Vietnam National Coal and Mineral Industries Group (TKV). The building offers flexible floor plates, integrated technical systems, and a convenient location in western Hanoi.
Vinacomin Tower is located on Duong Dinh Nghe Street, near the Duong Dinh Nghe – Trung Kinh – Pham Van Bach intersection and adjacent to Keangnam Landmark 72 and PVI Tower. This location provides convenient access to Cau Giay, Nam Tu Liem, Thanh Xuan, and Ring Road 3, Pham Hung, Khuat Duy Tien, and Tran Duy Hung routes.
Notable connections include:
Keangnam Landmark 72: approximately 3–5 minutes by car.
My Dinh Bus Station: approximately 8–10 minutes.
Big C Thang Long: approximately 8–10 minutes.
National Convention Center: approximately 8–10 minutes.
19-8 Hospital, Ministry of Public Security: approximately 8–10 minutes.
Cau Giay Park: approximately 10 minutes.
Vietnam National University, Hanoi: approximately 10–15 minutes.
Cau Giay Metro Station (Nhon – Hanoi Station line): approximately 10 minutes away.
Noi Bai International Airport: approximately 30–40 minutes, depending on traffic conditions.
The location on Duong Dinh Nghe Street is particularly suitable for businesses that frequently work in the Cau Giay – Nam Tu Liem – My Dinh area, while also offering convenient connections to Ring Road 3 and northern provinces.
Vinacomin Tower was developed with 35 office floors, 2 technical floors, and 5 basement levels. Some sources list a total of 37 floors when including the 2 technical floors. The building commenced commercial operations around Q1 2024, adding more than 30,000m² of office space to the Hanoi market.
The building also serves as the headquarters of Vietnam National Coal and Mineral Industries Group, while the remaining floors provide office space for tenant businesses.
The leasable office area is approximately 32,632–38,000m², depending on the source. Typical floor plates range from approximately 900–1,273m² per floor and can be subdivided into units of around 100m², 200m², 300m², and 500m², as well as larger units or whole floors.
The floor plates have a ceiling height of approximately 2.7m and feature a glass façade combining Schüco aluminium framing and Low-E glass, helping enhance natural light while supporting sound and thermal insulation for office spaces.
Vinacomin Tower is equipped with technical systems suited to large-scale office leasing requirements:
Elevators: high-speed Mitsubishi elevator system; technical sources note 23 elevators, together with 6 escalators in the service area.
Air conditioning: central Daikin Chiller air-conditioning system, with equipment clusters serving each floor area.
Backup power: backup generators with 100% capacity.
Fire safety: fire prevention and firefighting system in accordance with the building's standards.
Security: 24/7 security combined with a CCTV system; the building also implements smart access control through facial recognition.
Office infrastructure: finished suspended ceilings, LED lighting, power and network connection points in service boxes, and separate male and female restrooms on each floor.
Property management: directly managed by Vietnam National Coal and Mineral Industries Group (TKV).
Vinacomin Tower is positioned as a large-scale office complex focused on professional workspaces and an amenity system serving businesses. The area surrounding the building features numerous banks, restaurants, hotels, and services for the office community.
Close to the building are the amenities of the Keangnam – Pham Hung – Duong Dinh Nghe area, including restaurants, cafés, shopping centres, hotels, and services for business customers.
Vinacomin Tower is also a workplace for many domestic and international businesses. For example, Rikkei Soft previously operated an office in the building; current business registration data also records many companies with addresses at Vinacomin Tower.
Regarding the developer, Vietnam National Coal and Mineral Industries Group (TKV) is both the investor and manager of the building. The project was designed in a modern style, using a glass façade combined with concrete materials to create a bold form associated with the coal and mineral industry.
Vinacomin Tower was completed and commenced operations in Q1 2024, becoming one of the notable new office supplies in the Cau Giay market.
Criteria | Information |
|---|---|
Address | 03 Duong Dinh Nghe Street, Yen Hoa Ward, Hanoi |
Above-ground floors - basements | 35 office floors + 2 technical floors – 5 basement levels |
Floor area | Approximately 900–1,273m²/floor |
Rental rate | Approximately USD 20–26/m²/month, depending on area and timing |
Businesses seeking a price list, checking actual vacancy, or arranging a viewing of workspace at Vinacomin Tower may contact our specialist team:
Hotline / Zalo: 0879 83 3879
Email: cskh@tektra.vn
Service policy: Consultation, site surveys, and contract negotiation support are provided completely free of charge for tenants.
Phạm Minh Trí hiện phụ trách vị trí Phát triển đối tác tại TektraHomes , chuyên kết nối mạng lưới chủ đầu tư tòa nhà, ban quản lý dự án và các đối tác dịch vụ văn phòng tại Hà Nội. Anh đóng…
Advisor & AuthorView advisor profile →
Insights · Aug 15, 2026

Insights · Sep 11, 2026

Insights · Aug 29, 2026